Construction

Construction is the installation and assembling activities for the project equipment and materials at the site in accordance with approved construction drawings, procedures and specifications. We are capable of providing a wide range of services in construction field. Our highly skilled "in house" work forces and supervisors are capable of handling all type of Fabrication, assembly and erraction works for on shore/off shore modular/skid Construction. Such as:

PROCESS SKIDS

  • Chemical injection skids
  • Fuel gas treatment skids
  • Manifold skids
  • Metering skids
  • Generator skids
  • Compressor skids
  • Pump skids
  • Water treatment skids
  • Fuel oil skids


MODULAR CONSTRUCTION & PACKAGES

  • Local equipment room (LER)
  • Electrical power house
  • Analyser house
  • Instrument air package
  • Nitrogen Production package
  • Service air packages


Our core team of field engineers, supervisors, welding engineers, QA&C personals ensure that all the works are completed as per our client's specifications and requirements within specified schedule.



Construction Management Procedure Index


IEPCC SOLUTIONS (CONSTRUCTION) PROCEDURE INDEX
Item No Title Description Category Document No. Rev
1 Construction Equipment Preventive Maintenance Procedure CMT IEPCC-CMT-01 Rev-1
2 Construction Tools And Equipment Inspection & Certification Procedure CMT IEPCC-CMT-02 Rev-1
3 Construction Execution Plan CMT IEPCC-CMT-03 Rev-1
4 H-Beams, Tubular Fabrication Procedure CMT IEPCC-CMT-04 Rev-1
5 Structural Steel Fabrication Procedure CMT IEPCC-CMT-05 Rev-1
6 Fit Up, Assembly & Erection Procedure CMT IEPCC-CMT-06 Rev-1
7 Steel Fabrication Repair Procedure CMT IEPCC-CMT-07 Rev-1
8 Material Handling And Storage Procedure CMT IEPCC-CMT-08 Rev-1
9 Weight Control Procedure CMT IEPCC-CMT-09 Rev-1
10 Module Weighing And Loadout Procedure. CMT IEPCC-CMT-10 Rev-1
11 Flange Management Procedure CMT IEPCC-CMT-11 Rev-1
12 Bolt Tighten And Torqueing Procedure CMT IEPCC-CMT-12 Rev-1
13 Door Seal And Integrity Test Procedure CMT IEPCC-CMT-13 Rev-1
14 Standard Electrical Installation Procedure CMT IEPCC-CMT-14 Rev-1
15 Electrical Equipment Installation Procedure CMT IEPCC-CMT-15 Rev-1
16 Instrument Installation Procedure CMT IEPCC-CMT-16 Rev-1
17 Fire & Gas Devices Installation Procedure CMT IEPCC-CMT-17 Rev-1
18 Field instrument Calibration Procedure CMT IEPCC-CMT-18 Rev-1
19 Welding Repair Procedure CMT IEPCC-CMT-19 Rev-1
20 Distortion Control And Repair Procedure CMT IEPCC-CMT-20 Rev-1
21 Weld Identification And Traceability Procedure CMT IEPCC-CMT-21 Rev-1
22 Post-Weld Heat Treatment and Cleaning Procedure CMT IEPCC-CMT-22 Rev-1
23 Pressure Test, Flushing & Drying Procedure CMT IEPCC-CMT-23 Rev-1
24 Preservation Procedure CMT IEPCC-CMT-24 Rev-1
25 Marking, Packaging And Shipping Procedure CMT IEPCC-CMT-25 Rev-1