| IEPCC SOLUTIONS (CONSTRUCTION) PROCEDURE INDEX
|
| Item No |
Title Description |
Category |
Document No. |
Rev |
| 1 |
Construction Equipment Preventive Maintenance Procedure |
CMT |
IEPCC-CMT-01 |
Rev-1 |
| 2 |
Construction Tools And Equipment Inspection & Certification Procedure |
CMT |
IEPCC-CMT-02 |
Rev-1 |
| 3 |
Construction Execution Plan |
CMT |
IEPCC-CMT-03 |
Rev-1 |
| 4 |
H-Beams, Tubular Fabrication Procedure |
CMT |
IEPCC-CMT-04 |
Rev-1 |
| 5 |
Structural Steel Fabrication Procedure |
CMT |
IEPCC-CMT-05 |
Rev-1 |
| 6 |
Fit Up, Assembly & Erection Procedure |
CMT |
IEPCC-CMT-06 |
Rev-1 |
| 7 |
Steel Fabrication Repair Procedure |
CMT |
IEPCC-CMT-07 |
Rev-1 |
| 8 |
Material Handling And Storage Procedure |
CMT |
IEPCC-CMT-08 |
Rev-1 |
| 9 |
Weight Control Procedure |
CMT |
IEPCC-CMT-09 |
Rev-1 |
| 10 |
Module Weighing And Loadout Procedure. |
CMT |
IEPCC-CMT-10 |
Rev-1 |
| 11 |
Flange Management Procedure |
CMT |
IEPCC-CMT-11 |
Rev-1 |
| 12 |
Bolt Tighten And Torqueing Procedure |
CMT |
IEPCC-CMT-12 |
Rev-1 |
| 13 |
Door Seal And Integrity Test Procedure |
CMT |
IEPCC-CMT-13 |
Rev-1 |
| 14 |
Standard Electrical Installation Procedure |
CMT |
IEPCC-CMT-14 |
Rev-1 |
| 15 |
Electrical Equipment Installation Procedure |
CMT |
IEPCC-CMT-15 |
Rev-1 |
| 16 |
Instrument Installation Procedure |
CMT |
IEPCC-CMT-16 |
Rev-1 |
| 17 |
Fire & Gas Devices Installation Procedure |
CMT |
IEPCC-CMT-17 |
Rev-1 |
| 18 |
Field instrument Calibration Procedure |
CMT |
IEPCC-CMT-18 |
Rev-1 |
| 19 |
Welding Repair Procedure |
CMT |
IEPCC-CMT-19 |
Rev-1 |
| 20 |
Distortion Control And Repair Procedure |
CMT |
IEPCC-CMT-20 |
Rev-1 |
| 21 |
Weld Identification And Traceability Procedure |
CMT |
IEPCC-CMT-21 |
Rev-1 |
| 22 |
Post-Weld Heat Treatment and Cleaning Procedure |
CMT |
IEPCC-CMT-22 |
Rev-1 |
| 23 |
Pressure Test, Flushing & Drying Procedure |
CMT |
IEPCC-CMT-23 |
Rev-1 |
| 24 |
Preservation Procedure |
CMT |
IEPCC-CMT-24 |
Rev-1 |
| 25 |
Marking, Packaging And Shipping Procedure |
CMT |
IEPCC-CMT-25 |
Rev-1 |